Version Rollback
You can roll back the project to the version before a specified conversation round was initiated.
Note: Rollback operations are irreversible.
Use the following steps to roll back the project version:
- Find the target conversation.
- Click the Revert button on the left.
The dialog box shows the number of files that will be affected by this rollback, and the editor will open the file changes for this session.
- Confirm the scope of impact for this rollback.
- If this rollback meets expectations, click Confirm.
The agent begins rolling back the project.